Thursday 13 February 2014

January 2014 to dec 2014

It's all about the journey, not the destination

Interior paint is applied and the floor, made of recycled timber floor boards , is sanded and  holes patched with putty




Before After




21 22






January 2013 to dec 2013

beginning of 2013, we have the walls and roof installed, the floor and roof frames present and protected from weather . Rendering also done. Now the time to take a look at what remains. Flooring and ceilings need to be installed, as well electricity to be installed.

Before






A brand new folding door is installed in the family room, providing access to the patio




Working on the floor

Tools






Work starts 










After , when paint and windows have been refreshed













Windows glass pane replaced and wood is primed . Windows were  extracted from a house now demolished and renovated . Heavy sanding to remove lead based paints , repairs, reglazing of panes and fitting with new wheels for rolling on the rail

Before ...



After ....

Incidentally a new water heater is installed as the old water accumulation unit has failed. 
 The doors are installed

Now ceilings are installed


as well as the wall vents  and ceiling roses